Quantcast
Channel: SCN : Popular Discussions - SAP liveCache Technology
Viewing all articles
Browse latest Browse all 660

SCM Upgrade: LiveCache Upgrade Section C, Step 3 throws in Error

$
0
0

Hi Experts,

 

We are performing SCM Upgrade from 5.1 to 7.0 EHP3.

In Execution Step, we have been asked to Upgrade the Live Cache and perform Section C Steps of Report /SAPAPO/OM_LC_UPGRADE_70.

 

LiveCache has been upgraded successfully to, LCA Build 100.28 PL 002 with Kernel 7.9.8.35.

After that, we are performing Steps Under Section C.

C1 and C2 are completed successfully.

 

During Step C3, Load Mater Data,

we get an error message "Jobs for creating

Master Data are Faulty".

 

When we checked the background jobs, a background job,

RESOURCE_LC_CLIENT_300, fails below message:

Job started

Step 001 started (program

/SAPAPO/RESOURCES_LC_CREATE, variant &0000000000010, user ID DDIC)

Prepare data

Create Resources

Create Resources with setup matrix

Wrap Up

Error creating resources in liveCache

Check the spool

Error occurred while creating resources inliveCache

Job cancelled after system exception

ERROR_MESSAGE

 

 

In Spool we only find below information, no other information.

Below are the spool entries:

Data statistics Number of

Records passed 61

 

 

Can any one suggest what can done to eliminate this error.

 

Thanks and Regards,

 

PC


Viewing all articles
Browse latest Browse all 660

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>