Hi,
we are migrating (with DMO) our SCM (APO) system with external liveCache (SapDB) to HANA with integrated liveCache.
After SUM stops in phase "Restore liveCache" we run program /SAPAPO/OM_LC_DOWNLOAD_UPLOAD and executed steps "Load Master Data" and "UploadliveCache Data" without errors.
After performing step 6. "Compare liveCache with Download" (in Section C) we get a lot of ( about 3.000) warnings in protocol (see also attached file):
(...)
Produktionsauftrag BO2922 (Eigenf.): Dates/times changed by up to 82801 seconds
Produktionsauftrag BO2330 (Eigenf.): Dates/times changed by up to 54000 seconds
Produktionsauftrag BO1865 (Eigenf.): Dates/times changed by up to 32400 seconds
(..)
Why is there such a big gap between liveCache and download?
Kind regards
Stefan