Hello,
we already test-migrated a SCM 7.0 including Livecache data with changing the platform from HPUX/Oracle to Windows/MSSQL.
LC data have been saved using report /SAPAPO/OM_LC_DOWNLOAD_UPLOAD in the source system then LC has been installed on the target system and LC data then uploaded in the target system using /SAPAPO/OM_LC_DOWNLOAD_UPLOAD again.
Now we want to re-run the migration for cutover test and my question is whether it's possible to skip the new installation of the LC
and just upload the data after migration of SCM database into existing LC starting in section C of /SAPAPO/OM_LC_DOWNLOAD_UPLOAD at this point. Does LC initialization in step C2 do all the necessary cleanup steps in order to upload new data into existing LC again ?
Looking forward to your answers.
Thanks,
Juergen